View of one of Kodumaja’s materials warehouses. Here the factory production process begins.
All materials are stored in weather-protected conditions.
View of Kodumaja’s main timber warehouse.
The floor area of Kodumaja’s warehouses has been planned with sufficient redundancy to accommodate our needs in the case of much bigger production volumes than Kodumaja companies have ever needed before.
The production process starts with cutting of timber to specified dimensions.
Wall elements are ready, waiting to be assembled into prefab modules.
Production zone of flat pack elements at Kodumaja’s new factory.
Ceiling elements waiting to be assembled into prefab modules. Farther away you may see the outlines of the floor element production line.
Production of floor elements.
Assembling prefab modules.
Assembly of a big prefab module.
Now we may start the installation of entrance doors and windows, continue with piping and wiring and interior finishing.
Prefab modules on the production line.
Prefab modules on the production line.
Thermal insulation of prefab modules is an easy but crucial job.
Information for workers and works supervisors is easily available.
As an exception, a flexible production process gives an opportunity to begin the installation of windproofing materials before the mounting of entrance doors and windows.
Structures are closed. Now exterior finishing may begin.
Simultaneously, interior finishing works are progressing inside the prefab modules.
Surfaces have been prepared for the final interior finishing.
Simultaneously, “wet” rooms are being waterproofed.
Waterproofing of the floor has been finished. Now the installation of ceramic tiles may begin.
Simultaneously, interior finishing works of living rooms are progressing.
The completion of interior finishing works and preparations to install kitchen furniture.
Simultaneously, the installation of ceramic tiles in “wet” rooms has begun.
The bathroom walls are covered with ceramic tiles. All that remains is to install floor tiles, grout the tiles, wash the tiles and apply silicone in the corners .
Simultaneously, the installation of kitchen furniture in living spaces has started.
A finished and packed prefab module is transported outside the factory to make room for the assembly of new prefab modules.
Prefab modules in the storage yard of finished products are waiting for transport.
Prefab modules in the storage yard of finished products are waiting for transport.
Prefab modules are transported by road to a construction site or a port.
Prefab modules are on the berth, waiting for a freighter
The freighter has arrived. Loading has started.
The freighter’s cargo hold is getting full.
Kodumaja prefab modules may be also transported on deck.
…and even in two layers. Now the captain may navigate, for example, to Norway, Denmark or Sweden..