Sitemap

Preparation of construction site

  • A construction site has been prepared for laying a foundation.

  • The use of modular formwork in the construction of a house foundation.

  • The construction of a retaining wall and a layered foundation.

  • Deeply impregnated wooden beams are fastened to strip footing. After that, the foundation is ready for house assembly.

  • Strip footing is almost ready for house assembly. Damp proofing is still missing.

  • For a layered foundation, it is sometimes necessary to apply a levelling course to parts of the foundation to achieve the required surface evenness and elevation differences.

  • A foundation of a multi-storey residential building built over a multi-storey car park.

  • A foundation of a multi-storey residential building built over a multi-storey car park.

  • The foundation of a terraced house is almost ready for the installation of prefab modules.

  • The foundation of a semi-detached house is ready for the installation of prefab modules.

  • The foundation of a house is ready for the installation of prefab modules.

  • The foundation of a terraced house is almost ready for the installation of prefab modules.

  • A complicated foundation with a staircase tower is ready for the assembly of a multi-storey residential building from prefab modules.

eXact